This bridge is the link between Presint 4 on the Core Island and Presint 19 . Its location at the south-eastern end of the Persiaran Perdana makes it a landmark and the main route to the core island from the south-east.
Bridge Structure
The bridge design consist of seven spans of 30m between pier centrelines. It is dual three lane carriageways of total 10.5m width each and 0.5m width of marginal strip. The median width is 3m and walkway with cycle track. The following features of the bridge help embellish its beauty: