The bridge spans the lake and the promenades, connecting Presint 16 at the eastern side and Wisma Putra on the Core Island side.
It is a continuous structure where the piers are supported monolithically to the pilecaps. The main span is 60m long and two adjacent spans 35m each together with two 11.3m approaches make the total structure length of 152.6m. There are dual two lane carriageways, 3m median, walkway and cycle track.